STC ST01466LA-D
FAA DRS lists ST01466LA-D as Current · Reissued, held by Jetaire Aerospace LLC, for Boeing 737-300 Series. Recorded change: Installation of Fire Protection Systems, Lower Cargo Compartments. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
ST01466LA-D identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing 737-300 Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
Related cargo and special mission STCs
Installation of Precision Support Services' Dual Mission System (DMS).
FAA holder: Precision Support Services LLC
Installation of Fibrotek survey stinger.
FAA holder: Upper Limit Aviation
Conversion of an Airbus A321-200 passenger configuration airplane to a freighter configuration.
FAA holder: 321 Precision Conversions LLC
Installation of a Max-Viz 2300 Camera System.
FAA holder: Airbus Helicopters Inc.